Weekend Build Update -- Nov 25
Here's a weekend update from Mike Strada, our building chairman:
- The back half of the house has all it's sheathing on. One side of the roof is completely papered, the other side is half papered. The rough capping was also installed for this portion of the roof.
- The roof over the Master Bedroom now has sheathing.
- The inside was checked for sheetrock nailers and we think we got most of them for the walls.
- Up next: finish beams over the kitchen and living room to prepare for trusses.
See Pictures.
- The back half of the house has all it's sheathing on. One side of the roof is completely papered, the other side is half papered. The rough capping was also installed for this portion of the roof.
- The roof over the Master Bedroom now has sheathing.
- The inside was checked for sheetrock nailers and we think we got most of them for the walls.
- Up next: finish beams over the kitchen and living room to prepare for trusses.
See Pictures.
0 Comments:
Post a Comment
<< Home